Decide sequentially

  1. Demonstrate repeatable tile output manually.
  2. Identify trigger signal (changelog, SKU row).
  3. Wrap with scheduled worker once noise reduced.

If step one fails

Fix hook clarity before scaling scheduling.

Anchor reads

Site-change scheduling belongs after manual proof.